Skip to content
  • The ferry KMP Drajat on the slipway, seen from the air.
  • KMP Drajat on the slipway, facing the sea.
  • KMP Drajat in the water, with an excavator and a crane alongside.
  • KMP Drajat being undocked with the help of a crane.
  • KMP Drajat afloat beside the shipyard's quay.

Photo 1 of 5

All projects

KMP Drajat

Work
Major repair and shaft alignment

One of the largest and most complex projects we have taken on, not least for aligning the shaft to the engine of the ferry KMP Drajat. These photos are from its undocking at the Lintech Seaside Facility.

Have similar work?

Tell us what your ship needs on WhatsApp.

Chat on WhatsApp